Project Execution
From Factory Acceptance Test to Site Acceptance Test
Each customer project is handled by a dedicated Project Manager, who is the first level of contact to the customer team. Quality and times lines, as well as project status reporting, are the main focus in addition to risk management, resource management and cost control. Guided by our dedicated team of lead engineers, experienced manufacturing teams complete the assembly, manufacturing and commissioning tests during FAT/SAT, ensuring the high level of quality required by pharmaceutical industries. During the execution phase all relevant manufacturing and commissioning test documents are prepared and approved by the customer before handover together with a compressive documentation package.
Typical tasks and deliverables during Project Execution:
? Project Management
? Assembly and Manufacturing
? Commissioning and Qualification
? Factory Acceptance Test (FAT)
? On-Site Installation
? Site Acceptance Test (SAT)
探索我們的項(xiàng)目階段:
我們的集成解決方案團(tuán)隊(duì)致力于開發(fā)和實(shí)施快速且經(jīng)濟(jì)高效的生物制造解決方案,涵蓋早期開發(fā)、規(guī)模放大,再到商業(yè)制造的各個(gè)階段。